Entro Walker Rebuild
Entro renews their equipment for new applications
Entro Walkers were installed and operating on a rig for a major client for seven years. The rig was eventually decommissioned. The walking system appeared to be in good operational order, and thus could be used for future projects. The stomper assemblies were returned to Entro for refurbishment and installation into another machine. The machinery was disassembled, cleaned, and evaluated for proper operation. The Entro engineering group evaluated the suitability of equipment for use in a new rig in the client's inventory, and designed new jack support structures and connections to the rig. New control consoles with wireless remote control were built to work with the machinery. The machinery was then repainted and reassembled.